wp00874987.gif
wp520623b6_1b.jpg
wp520623b6_1b.jpg
wp541aa0cd_1b.jpg
wpe86f5164_1b.jpg
LAYOUTS
MIDDLEWOOD
An “OO” gauge Layout
originally built to test out modelling techniques
By Paul Levy
wp4ee65730_1b.jpg
THE LAYOUT IS SET IN THE 1950’s - 1960’s, SOMEWHERE AROUND THE WYE VALLEY (FOREST OF DEAN) AREA.
The Layout is wired for both conventional, and DCC operation.  The track used is PecoSetrack”.
All points are motorized, using push-to-make switches.
The layout is built on a standard 2”x1” batton frame, with a 6mm. Plywood top.
The total size is 50” X 42”.
The landscape is made using expanding foam, with plaster to finish.
Provision for the Control Panel has been made by cutting into the hillside.
PHOTO   GALLERY
wp067a181c_1b.jpg
wpf3a77b43_1b.jpg
wpab2aff6d_1b.jpg
wp6e3c0322_1b.jpg
wpd0a78476_1b.jpg
wpf80f9a92_1b.jpg
A complete view of the layout, showing both scenic and fiddle-yard areas
A ‘cameo’ shot: a police car waits by the station - to arrest a troublesome passenger perhaps!
wp6c859c39_1b.jpg