Mike’s Garden Railway is completely finished, scenically, and electrically, but like all such Projects, there are sometimes improvements and modifications to be done. Maintenance is constantly required, if only to remove the leaves in Autumn (Fall), or even to ensure that there are no frogs or toads on the line. Continuous running is achieved by using two loops, one around the garden shed, in which all the electrical control is housed, and the other at the end of a pathway at the side of the house.
This is a German Narrow Gauge garden layout in G-Scale, with a station, and buildings providing the central focal point.